WORLD CLASS INFRASTRUCTURE

A 504MVA dedicated gas-powered generating station
A 309,390 m3/day water Work
212,780 m3 /day waste and sewage treatment
924 m3/day solid waste handling
Integrated Information and Communication Technology that will optimize city operations to be built end to end over 10 years by a Silicon Valley based IT company, Double GDP.
Reliable high fidelity Broadband Internet.
2 active gas pipelines run through the city from Owaza captive gas field less than 4km from the perimeter from the city.
The city has proximity to two (2) existing and one proposed seaports.

WORLD CLASS INFRASTRUCTURE

A 504MVA dedicated gas-powered generating station
A 309,390 m3/day water Work
212,780 m3 /day waste and sewage treatment
924 m3/day solid waste handling
Integrated Information and Communication Technology that will optimize city operations to be built end to end over 10 years by a Silicon Valley based IT company, Double GDP.
Reliable high fidelity Broadband Internet.
2 active gas pipelines run through the city from Owaza captive gas field less than 4km from the perimeter from the city.
The city has proximity to two (2) existing and one proposed seaports.